Crews will lay tracks for the Purple Line of the Tel Aviv light rail at 11 sites across the city this week. The work will take place Sunday through Thursday, November 8 to 12, every night from 10 p.m. to 5 a.m.
The work is being carried out by NTA Metropolitan Mass Transit System through the contractor Shahaf. These are the affected locations:
North Tel Aviv
- Al Parashat Drakhim Street: between Street 1285 and Namir Road.
- Arlozorov Street: between Ibn Gabirol and Bloch streets.
- Arlozorov near Sokolov: work on Arlozorov Street in the Sokolov Street area.
- Ben Yehuda Street: between Arlozorov and Bograshov streets.
City center and Allenby
- Allenby Street: between HaYarkon and Pinsker streets.
- Allenby, King George and Tchernichovsky: Allenby between Pinsker and King George, King George between Merkaz Baalei Melacha and Shenkin, and the Allenby-Tchernichovsky intersection.
- Allenby, Gruzenberg and Montefiore: Allenby between King George and Montefiore, Gruzenberg between Nahalat Binyamin and Allenby, and Montefiore between Yavne and Allenby.
- Yehuda HaLevi: Yehuda HaLevi, Allenby and HaAliya streets and Rothschild Boulevard.
South and east Tel Aviv
- Levinsky Street: between Chlenov and Levanda streets.
- HaHagana Road: including the section between HaTayasim Road and Samekh Vav Street.
- HaShalom Road and HaTayasim Road: HaShalom Road between Street 1063 and Oded Street, and HaTayasim Road between Oded Street and Street 1063.
Work hours at all sites: 10 p.m. to 5 a.m., nights of November 8 to 12.
More information is available on the municipality website.


